Hotel Furniture and Interiors for North Cyprus: Manufacturing in Turkey, Shipping and Delivery Guide (2026)
Share

Hotel lobby: bespoke timber wall panelling and fitted furniture. An RVK Mobilya Dekorasyon project.
Short answer. RVK Mobilya Dekorasyon manufactures guest room furniture, lobby and reception desks, restaurant and bar joinery, wooden interior doors and wall panelling for hotels in North Cyprus, and ships them to the island. Production follows the hotel's or interior designer's dimensioned drawings. Goods ship flat-pack or with assembled carcasses, numbered and palletised. Installation is not included in the price; on request it is quoted as a separate line. Production management and quality control are carried out in Istanbul, Türkiye.
Written by Volkan Kıyan, RVK Mobilya Dekorasyon. Last updated: 20 October 2026.
Hotel furniture for North Cyprus: what we make
- Guest rooms: wardrobes and luggage areas, headboard panels, bedside tables, desks, TV units, minibar cabinets
- Lobby and reception: reception desks, timber wall panelling, decorative niches and display cabinets
- Restaurants, bars and casino areas: bar counters, column cladding, timber ceilings and walls
- Doors: lacquered MDF and natural veneer interior doors with frames and architraves
- Bathrooms: vanity units and marble countertops
We cover standard room packages for midscale hotels in our hotel room furniture package guide and bespoke work for boutique hotels in our boutique hotel furniture article.

Wooden interior door and architectural woodwork. An RVK Mobilya Dekorasyon project.
Why a hotel refurbishment should not be postponed
A study of 46 hotels found that guest satisfaction falls as the time since the last guest room renovation grows, and that satisfaction moves together with revenue and profitability measures (Bloom, 2015). Another study showed that hotel design quality significantly predicts guest satisfaction, which in turn shapes the intention to return and recommend (Zemke et al., 2017). Guest room furniture is therefore not a decoration item but an investment that affects occupancy and room rates.
The hotel sector in North Cyprus is closely tied to the Turkish economy: research covering 78 hotels in North Cyprus showed that economic developments in Turkey directly affect the island's hotel industry (Okumus, Altinay and Arasli, 2005). The same tie is an advantage on the supply side: a shared language, similar dimension and material habits, and a short sea route.
Materials and hardware
| Item | Standard |
|---|---|
| Carcass | 18 mm melamine-faced chipboard or MDF; moisture-resistant board option around bathrooms and minibars |
| Doors and surfaces | Lacquered MDF (RAL or NCS colour), natural wood veneer, melamine, high gloss |
| Joints | Flat-pack items with dowel + minifix connections |
| Hardware | Samet soft-close runners and hinges (2-year warranty); Blum on request |
| Board class | E1 board; the board used is stated in the quotation |
| Warranty | 24 months against manufacturing defects |
Wood-based panels are among the main sources of indoor formaldehyde (Salthammer, Mentese and Marutzky, 2010), so in closed, air-conditioned guest rooms the board class should be written in the quotation. In the humid coastal climate of Cyprus we recommend moisture-resistant board around bathrooms and minibars.

Example of a guest room wardrobe and luggage area.
Shipping, customs and installation
- Goods ship flat-pack or with assembled carcasses; doors are packed separately.
- Every part is labelled by room and module number, with an assembly guide and installation video.
- ISPM 15 stamped pallets or crates; loading is photographed. Details in our export packaging guide.
- Shipments go by sea from Turkey's southern ports (Mersin, Taşucu) to Famagusta and Kyrenia; we provide a freight quote on request.
- Customs and fund charges in North Cyprus are paid by the buyer; confirm current rates with your customs broker.
- Installation is not included in the price. On request, installation on the island is quoted as a separate line.

Full container loading for the United Kingdom (London, 20-apartment project).
Price, payment and lead time
Prices are itemised by room type and quantity, surface material and hardware. Prices are EXW Istanbul in TRY, USD, EUR or GBP. Payment: 40% with the order, 60% before shipment, by bank transfer. The quotation is ready within 1-2 working days of receiving drawings and lists, and is valid for 10 days. Lacquered and veneered items take about 45 working days; melamine flat-pack items are faster. For fire-rated doors, the certificate status is stated in writing in the quotation.
What to send for a quotation
- Dimensioned room plans and interior drawings (PDF or DWG)
- Room types and quantity of each
- Surface and colour preference (RAL or NCS code, or a reference photo)
- Lobby, restaurant and door lists, if any
- Delivery address and target opening date
- Whether installation is required
Frequently asked questions
Do you install?
Installation is not included in the price. On request, installation on the island is quoted as a separate line. As parts arrive numbered with a guide, local teams can also install them.
Do you prepare drawings?
No. Production follows the hotel's or interior designer's dimensioned drawings.
What is the lead time?
About 45 working days for lacquered and veneered items, shorter for melamine flat-pack. Time starts after the deposit and dimension approval.
What are the payment terms?
40% with the order, 60% before shipment, by bank transfer. We do not work with letters of credit.
Which areas do you deliver to?
Kyrenia, Nicosia, Famagusta, Iskele, Morphou and all of North Cyprus.
Send your hotel drawings and receive an itemised quotation within 1-2 working days. WhatsApp: +90 535 230 24 62 · Email: info@rvkmobilya.com
Sources
- Bloom, B. A. N. (2015). Hotel renovations and their impact on guest satisfaction. International Journal of the Built Environment and Asset Management, 1(4). inderscience.com
- Zemke, D. M., Chen, Y., Raab, C. and Zhong, Y. Y. (2017). Hotel design's influence on guest satisfaction and behavioral intentions. Anatolia, 28(3), 338-350. doi:10.1080/13032917.2017.1319868
- Okumus, F., Altinay, M. and Arasli, H. (2005). The impact of Turkey's economic crisis of February 2001 on the tourism industry in Northern Cyprus. Tourism Management, 26(1), 95-104. EMU open repository
- Salthammer, T., Mentese, S. and Marutzky, R. (2010). Formaldehyde in the indoor environment. Chemical Reviews, 110(4), 2536-2572. doi:10.1021/cr800399g