Bespoke Joinery for Renovation Projects: Made-to-Measure Kitchens, Interior Doors, Wall Panelling and Built-ins for Villas, Period Apartments and Waterfront Homes

Quick answer. Most renovation projects in Europe and North America need joinery that no catalogue sells: kitchens, interior doors, wall panelling, wardrobes and vanity units that fit walls which are not square, openings that are not standard and staircases that a full-height cabinet will never climb. RVK Mobilya Dekorasyon is a custom furniture and joinery manufacturer in Istanbul, Turkey. We produce these items to the drawings approved by your architect, interior designer or contractor, split them into modules labelled room by room, and ship them EXW Istanbul, by road to most of Europe in 4–7 days. This guide is for renovation contractors, architects, interior designers, developers and owners of villas, period apartments and waterfront homes. It covers what a renovation demands from joinery, the technical points that decide quality, how to fit manufacturing into the renovation schedule, and how we work.

Written by Volkan Kıyan, owner of RVK Mobilya Dekorasyon, Istanbul. Last updated: 6 October 2026.

Key facts at a glance

QuestionOur answer (2026)
What we make for renovationsKitchens, interior doors and door sets, wall panelling (boiserie), wardrobes and dressing rooms, built-in storage and libraries, bathroom vanities; marble and porcelain worktops and slabs
Who we work withRenovation contractors, architects, interior designers, developers and private owners
What we need to quoteDrawings approved by your architect, designer or contractor; site measurements taken after plastering; photos of existing details; destination country
QuotationItemised proforma in 1–2 working days, valid 10 days; 100 USD technical-review fee, deducted in full from the order
Production time (2026 examples)30 lacquered interior doors in about 10 days; wall panelling 15–30 working days; a veneered custom kitchen 45 working days. Confirmed on each proforma
TransitRoad: most of Europe 4–7 days, Germany 5–8 days. Sea LCL to the UK: 14–16 days door to door
Payment40 % deposit with the order, 60 % before shipment, by bank transfer; no letters of credit
Delivery termsEXW Istanbul; on request we obtain a freight quotation from a forwarder
InstallationBy your own fitters: modules numbered and packed by room, with an assembly guide and installation videos
Warranty24 months on manufacturing defects

Renovation is where most of the work is

Europe's building stock is old and changes slowly. According to the European Commission's Renovation Wave strategy, more than 220 million building units, 85 % of the EU building stock, were built before 2001, and 85–95 % of today's buildings will still be standing in 2050. One third of the stock is over 50 years old and more than 40 % was built before 1960. Only about 11 % of existing buildings undergo some level of renovation each year; the strategy aims for 35 million renovated building units by 2030. It also states a principle that matters to anyone making joinery: renovation has to respect design, craftsmanship and heritage.

In the United States, homeowner spending on improvements and repairs stood at about USD 517 billion in the second quarter of 2026 and is projected to reach about USD 519 billion by mid-2027, according to the Leading Indicator of Remodeling Activity (LIRA) published by Harvard's Joint Center for Housing Studies in July 2026. Growth is slowing to around 0.5 % a year, but the remodeling market stays above half a trillion dollars.

The environmental evidence points the same way. A systematic review of 251 case-study buildings in 19 countries found that most refurbishments had a lower life-cycle carbon footprint than most new buildings, although not every one (Schwartz, Raslan and Mumovic, 2018). A later study of London housing types by the same team found that refurbishment outperformed demolition and replacement over the full life cycle and over a 20-year horizon too (Schwartz, Raslan and Mumovic, 2022). Keeping a building and renewing its interior is usually the lower-carbon choice, and the interior is where joinery lives.

Why standard furniture rarely fits a renovation

New buildings are designed around standard modules. Old buildings were not. These are the problems we see most often in renovation drawings:

  • Walls and floors out of square and out of level. Deviations of a centimetre or more along a wall are common in older masonry; a standard cabinet leaves gaps that no filler hides.
  • Non-standard openings. Door openings in period buildings rarely match today's standard leaf sizes, and a new door has to fit the existing opening and often the existing architraves.
  • High and sloping ceilings. Ceilings well above three metres in 19th-century apartments; sloping walls in attic conversions that call for built-ins cut to the roof line.
  • Services in the way. Pipes, radiators, chimney breasts and fuse boards that the joinery has to work around.
  • Features to protect. Mouldings, cornices, fireplaces and parquet that cannot be cut.
  • Access. Narrow staircases, small lifts and no crane access: a 2.4-metre tall unit that cannot turn on the landing is useless.
  • Occupied homes and short installation windows. Owners often live next door or in part of the property, so installation has to be fast and clean.

Made-to-measure joinery solves these problems in the factory instead of on site. Every piece is sized from the measured drawing, carries scribe allowances where walls are uneven, and is split into modules that fit through the building.

What we manufacture for renovation projects

ItemTypical renovation useWhat to specify
KitchensPeriod apartments, villa kitchens, open-plan conversionsFront finish (lacquer, veneer, melamine), carcass board and emission class, hardware brand, worktop
Interior doors and door setsNew doors matched to existing openings and profilesLeaf and frame size per opening, panel or moulding design, colour (any RAL), handing
Wall panelling (boiserie)Panelled salons, libraries, bed wallsPanel layout, mouldings, fixing system, fire class if required
Wardrobes and dressing roomsAlcoves, under-stair spaces, attic slopesInternal layout, door type, lighting
Built-in storage and librariesChimney alcoves, hallways, studiesShelf loads, finish, integrated lighting
Bathroom vanitiesBathrooms in older buildingsMoisture-resistant board, basin and tap cut-outs
Marble and porcelainWorktops, splashbacks, vanity tops, floorsStone type, thickness, edge profile, book-matching

For complete apartment and villa packages, see our bespoke furniture page and the guide to door schedules for luxury interiors.

Renovation by building type: what each one needs

Paris Haussmann and French period apartments

High ceilings, moulded wall panelling, chevron parquet and narrow service stairs. Panelling and tall units travel in knock-down sections that pass the stair and the lift, and finishes are matched to the existing mouldings. In the surroundings of historic monuments and in sites patrimoniaux remarquables, most applications for works need the agreement of the Architecte des Bâtiments de France (French Ministry of Culture), so check early for anything visible from outside, such as entrance doors.

Victorian, Edwardian and Georgian homes in the UK

Alcove cupboards beside chimney breasts, four-panel doors and kitchens in rear extensions. If the house is listed, the listing covers the whole building, interior included, unless parts are specifically excluded, and listed building consent is needed for works that affect its special interest, which can include replacing historic doors or panelling (Historic England).

German, Austrian and Hungarian Altbau apartments and attic conversions

Ceilings often above three metres, double-leaf doors and, in attic conversions, sloping walls that need built-in wardrobes cut to the roof pitch. In Germany, listed buildings (Baudenkmäler) are protected under each federal state's monument law, and changes generally need a permit from the local monument authority.

Pre-war apartments, brownstones and older homes in the United States

Custom cabinetry and millwork for a US remodel are specified in inches, built to US cabinet heights and made from panels certified to TSCA Title VI. For historic tax-credit rehabilitations, the Secretary of the Interior's Standards apply to interiors as well as exteriors: where a distinctive feature has to be replaced, the new one should match the old in design, colour, texture and other visual qualities and, where possible, materials (Standard 6). We work in centimetres or inches.

Mediterranean and Gulf villas

Large volumes, coastal humidity, strong sunlight and air-conditioned interiors. Material choice matters more here than anywhere: moisture-resistant boards in kitchens and bathrooms, finishes chosen for sun exposure (natural veneers change colour in strong light) and hardware suited to humid air.

Waterfront homes and Bosphorus yalı mansions

Salt air and constant humidity are hard on joinery. Near water we specify moisture-resistant MDF for carcasses, seal every edge and cut-out, and use hardware suited to humid environments. Historic yalı mansions on the Bosphorus are typically registered cultural property; in Turkey, works on registered buildings need the approval of the regional conservation council under Law No. 2863.

Technical details that decide quality in a renovation

1. Tolerances and scribing

We build scribe allowances into end panels and fillers so your fitter can trim each run to the real wall; adjustable legs and three-way adjustable hinges absorb uneven floors and walls. Wall panelling keeps a gap of at least 5 mm to ceiling and floor, hidden behind the cornice and the skirting.

2. Moisture: install after the building has dried

Wood is hygroscopic: it exchanges moisture with the surrounding air and changes dimension as relative humidity and temperature change, and many problems with wood in service come from changes in moisture content (Glass and Zelinka, 2021). Plaster, screed and tile adhesive release a great deal of water during a renovation. Joinery should go in only after the wet trades have dried and the building has been heated or ventilated, and panels and doors should then acclimatise in the room for at least 48 hours before fixing. Indoor relative humidity typically swings from about 25 % in a heated winter to about 60 % in summer, which corresponds to wood moisture of roughly 5–6 % and about 11 %; scribe gaps and expansion joints are designed for that range.

3. Low-emission boards

People often live in or next to a renovation. We specify E1 or E05 boards for Europe and TSCA Title VI panels for the United States, and since 6 August 2026 the EU also applies a REACH formaldehyde limit to furniture. Details are in our guide to formaldehyde classes and limits for custom furniture.

4. Fire performance

In apartment buildings, hotels and conversions, wall linings may need a reaction-to-fire classification under EN 13501-1 and some doors a fire-resistance rating. Both have to be specified by the architect at enquiry stage and backed by a test report or certificate for the exact product; we quote fire-rated items only where valid evidence for that product exists. Research into more sustainable fire-retardant treatments for timber is active: Yetilmezsoy et al. (2022), for example, investigated recovered struvite as a flame retardant for wooden structures.

5. Matching what is already there

To reproduce a door, a moulding or a panel profile, send a sample piece, a profile drawing from your architect or clear photographs with dimensions. We match profile, colour and sheen as closely as the material allows and confirm with a physical sample before production.

6. Access and packing

Before production we confirm the narrowest point on the delivery route (stair width, landing turn, lift car size) and split tall units and long panels to suit. Every module is numbered and packed by room on ISPM 15 pallets or in crates; see our guide to export packaging and container loading.

Fitting manufacturing into the renovation schedule

What delays joinery is almost never production. It is late measurement and late drawing approval. A sequence that works:

  1. Strip-out and survey: decide what stays (mouldings, floors, doors) and what goes.
  2. First fix and wet trades: services, plaster, screed.
  3. Site measurement after plastering, by your contractor or architect.
  4. Drawing approval by your architect or designer, and finish samples approved.
  5. Production in Turkey while the building dries. 2026 examples: 30 lacquered doors in about 10 days, panelling in 15–30 working days, a veneered kitchen in 45 working days.
  6. Transit: 4–7 days by road to most of Europe; 14–16 days door to door by sea LCL to the UK.
  7. Second fix: your fitters install from the numbered modules and the assembly guide.

Split deliveries help: door frames and panelling can go first, kitchens and vanities after floors and tiling. Prices, lead times and payment terms are explained in our 2026 price and lead-time guide.

How we work with renovation contractors, architects and owners

  1. Send your drawings: plans and elevations approved by your architect, designer or contractor, site measurements, photos of existing details, the destination country and your preferred hardware brand, through the contact page or WhatsApp.
  2. Technical review and proforma: we check the drawings for manufacturability, propose materials and send an itemised proforma within 1–2 working days, valid 10 days. The 100 USD review fee is deducted from the order.
  3. Deposit and samples: the 40 % deposit fixes the price; colour and finish samples go by courier for your approval.
  4. Production: kitchens and wardrobes are made in partner factories in the İnegöl region, doors in the Kastamonu door cluster, vanities in the Düzce region and classical millwork in Ankara; quality control and export are managed from Istanbul. You receive progress photos and videos. Why each product is made where it is: where furniture is made in Turkey.
  5. Balance, packing and documents: the 60 % balance is paid against pre-shipment photographs; we pack by room and prepare the invoice, packing list and origin documents (A.TR for the EU customs union, an origin declaration for the UK).
  6. Handover EXW Istanbul: your forwarder collects, we load, your fitters install.

What we have already shipped

We have manufactured and exported fitted furniture for an apartment interior project in Bristol, United Kingdom, shipped labelled crates to Bahrain and England, and loaded full 40-foot containers for the UK. Photographs and project details are on our Projects page.

Renovation joinery checklist

  1. Measure after plastering, not before.
  2. Mark what stays: mouldings, floors, doors, fireplaces.
  3. Confirm heritage permissions (listed building consent, ABF, monument authority, conservation council) before ordering anything visible.
  4. State the emission class (E1, E05, TSCA Title VI) and any fire class in the enquiry.
  5. Give the narrowest access dimension on the delivery route.
  6. Use moisture-resistant board in bathrooms, kitchens and near water.
  7. Send a sample or photo with dimensions of every profile to be matched.
  8. Approve finish samples under the room's own light.
  9. Install after the building has dried, with 48 hours of acclimatisation.
  10. Ask for room-by-room labels and a packing list.

Frequently asked questions

Can you make joinery for an old building where nothing is square?

Yes. Every piece is sized from your measured drawing, with scribe allowances and adjustable fittings so your fitter can close the gaps on site.

Can you reproduce our existing period doors or mouldings?

Yes, from a sample piece, a profile drawing or detailed photographs with dimensions. We confirm profile, colour and sheen with a physical sample before production.

What do you need from us to quote?

Drawings approved by your architect, interior designer or contractor, site measurements, photos of existing details and the destination country. We manufacture to those drawings.

Will tall units fit up a narrow staircase or into a small lift?

Yes. Tall units and long panels are split into modules sized to the narrowest point of the route you give us.

How long does it take?

Production time is confirmed on the proforma. In 2026, 30 lacquered doors took about 10 days, wall panelling 15–30 working days and a veneered kitchen 45 working days; add 4–7 days by road to most of Europe.

Do you install?

Not outside Turkey. Modules are numbered and packed by room, with an assembly guide and installation videos for your fitters.

Is renovating really better than building new?

In carbon terms, usually yes: a review of 251 case studies found that most refurbishments had a lower life-cycle carbon footprint than most new buildings, though not all (Schwartz et al., 2018).

Which countries do you deliver to?

We quote EXW Istanbul for any destination. Past shipments include the United Kingdom, Bahrain and Tunisia; by road we reach most of Europe in 4–7 days.

About RVK Mobilya Dekorasyon

RVK Mobilya Dekorasyon is a custom furniture and joinery manufacturer based in Bakırköy, Istanbul, Turkey. We make made-to-measure kitchens, interior doors, wall panelling, wardrobes, built-in storage and bathroom vanities, and supply marble and porcelain slabs, for renovation and new-build projects (villas, apartments and hotels) in Turkey, Europe, the United Kingdom, the United States, the Gulf and Africa. Production follows the drawings approved by the client's architect, designer or contractor. Contact: info@rvkmobilya.com, WhatsApp +90 535 230 24 62.

Planning a renovation?

Send your drawings, site measurements and the destination country through our contact page or on WhatsApp. You receive an itemised proforma within 1–2 working days.

Sources

  • European Commission (2020). A Renovation Wave for Europe – greening our buildings, creating jobs, improving lives. COM(2020) 662 final. EUR-Lex
  • Joint Center for Housing Studies of Harvard University (2026). Remodeling Spending Poised for Further Slowdown, Leading Indicator of Remodeling Activity, 23 July 2026. jchs.harvard.edu
  • Schwartz, Y., Raslan, R. and Mumovic, D. (2018). The life cycle carbon footprint of refurbished and new buildings – A systematic review of case studies. Renewable and Sustainable Energy Reviews, 81, 231–241. doi.org/10.1016/j.rser.2017.07.061
  • Schwartz, Y., Raslan, R. and Mumovic, D. (2022). Refurbish or replace? The life cycle carbon footprint and life cycle cost of refurbished and new residential archetype buildings in London. Energy, 248, 123585. doi.org/10.1016/j.energy.2022.123585
  • Glass, S. V. and Zelinka, S. L. (2021). Moisture relations and physical properties of wood. Chapter 4 in Wood Handbook: Wood as an Engineering Material, General Technical Report FPL-GTR-282. USDA Forest Service, Forest Products Laboratory. research.fs.usda.gov
  • Yetilmezsoy, K., Dinç Şengönül, B., İlhan, F., Kıyan, E. and Yüzer, N. (2022). Use of sheep slaughterhouse-derived struvite in the production of environmentally sustainable cement and fire-resistant wooden structures. Journal of Cleaner Production, 366, 132948. doi.org/10.1016/j.jclepro.2022.132948
  • Historic England (2021). Listed Building Consent: Historic England Advice Note 16. historicengland.org.uk; Historic England, Living in a Grade I, Grade II* or Grade II Listed Building. historicengland.org.uk
  • U.S. National Park Service. The Secretary of the Interior's Standards for Rehabilitation (36 CFR 67). nps.gov
  • Ministère de la Culture (2020). Les travaux en abords de monuments historiques et dans les sites patrimoniaux remarquables. culture.gouv.fr
  • 2863 sayılı Kültür ve Tabiat Varlıklarını Koruma Kanunu (Law No. 2863 on the Conservation of Cultural and Natural Property), Türkiye. mevzuat.gov.tr
  • Lead times, payment, transit and process: RVK Mobilya Dekorasyon quotation terms, 2026, EXW Istanbul.

Last updated: 6 October 2026. Figures on lead times, payment and transit are our own 2026 quotation terms; only a dated proforma is binding.